3.2. Biaya Produksi
3.2.1. Harga Bahan
No | Nama Bahan | Spesifikasi | Satuan | Jumlah | Harga |
1 | Kabel | NYM 3×4 | Meter | 9 | Rp 160.000 |
2 | As kuningan | Ø 25 mm | Kg | 1,08 | Rp 64.000 |
3 | Pompa Air | EFOS 125 | ¼ PK | 1 | RP 185.000 |
4 | Nepel Kuningan | ¾ x ¼ | Buah | 4 | Rp 30.000 |
5 | Selang Solar | Ø 3/8” | Meter | 8 | Rp 80.000 |
6 | MCB | 1 phasa 4 A | Buah | 1 | Rp 20.000 |
7 | MCB | 1 Phasa 32 A | Buah | 1 | RP 30.000 |
8 | Saklar | 4 A | Buah | 1 | Rp 10.000 |
9 | As Tembaga | P : 50 mm, Ø 20 mm | Kg | 0,286 | RP 40.000 |
10 | Kabel | NYM 2×1,25 | Meter | 2,5 | Rp 7.000 |
11 | Ember | Jumbo | Buah | 1 | RP 60.000 |
12 | Klem | Klem Pipa | Buah | 7 | Rp 17.500 |
13 | Lem Pipa | No 10 | Buah | 1 | Rp 5.000 |
14 | Shock | ¾” | Buah | 2 | Rp 5.000 |
15 | Selang | Selang plastic | Meter | 1 | Rp 5.000 |
16 | Sambungan PPC | Sambungan pipa ke selang | Buah | 2 | Rp 8.000 |
17 | Knee | ¾ “ | Buah | 5 | Rp 20.000 |
18 | Isolatip | - | Buah | 1 | Rp 5.000 |
19 | Mur dan Baut | M 6 | Buah | 4 | Rp 3.000 |
20 | Klem kabel | No 10 | Pcs | 1 | Rp 5.000 |
21 | Amplas | Kasar | Buah | 2 | Rp 5.000 |
22 | Paku | - | Buah | 2 | Rp 1.000 |
23 | Efoxy | - | Kg | ½ | Rp 30.000 |
24 | Tiner | - | Liter | 2½ | Rp 25.000 |
25 | Cat besi | Merah | Kg | ¼ | Rp 17.000 |
26 | Cat besi | Hijau | Kg | ¼ | Rp 15.000 |
27 | Lain-lain | - | - | - | Rp 50.000 |
Total | Rp 911.950 |